June Bike Ride


Bicycle Ride
June 5, 2016
Show-up 6:30am   –   Roll-out 7:00am

Start/Finish from “Link Stop” parking lot
2-hour no-drop ride
Part on CV Link route – short sand section (walk)
Some sidewalks – mainly roads with traffic
Road or Mountain Bike – HELMET REQUIRED
After ride refreshments

Friends of CV Link Ride — June 5th — show time: 7:30, roll-out 7am; start from “Link Stop Coffee Shop” parking lot on east side of Cathedral Canyon Dr., just south of the wash. Plan on a no-drop 2 hour ride. Refreshments provided at “Link Stop” after ride.

The ‘Link Stop’ is connected to Moguel & Kaya’s Auto Detail shop at 35688 Cathedral Canyon Drive in CC.  The parking lot is on east side of CC Drive just prior to going through the wash dip when heading north.